Triple

T19792908
Position Surface form Disambiguated ID Type / Status
Subject Buffumville Lake recreation area E475461 entity
Predicate partOf P40 FINISHED
Object Buffumville Lake project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Buffumville Lake project | Statement: [Buffumville Lake recreation area, partOf, Buffumville Lake project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Buffumville Lake project
Context triple: [Buffumville Lake recreation area, partOf, Buffumville Lake project]
  • A. Nolin River Lake project
    The Nolin River Lake project is a U.S. Army Corps of Engineers flood-control and recreation initiative centered on Nolin River Lake in central Kentucky.
  • B. Tioga-Hammond Lakes flood control system
    The Tioga-Hammond Lakes flood control system is a U.S. Army Corps of Engineers project in north-central Pennsylvania that uses two interconnected reservoirs and dams to reduce flooding, provide recreation, and support water management along the Tioga River and surrounding region.
  • C. Rough River Dam project
    The Rough River Dam project is a U.S. Army Corps of Engineers flood-control and recreation initiative in Kentucky centered on the construction and management of Rough River Lake and its associated dam infrastructure.
  • D. Howard A. Hanson Dam project
    The Howard A. Hanson Dam project is a major flood-control and water management infrastructure initiative on Washington’s Green River that protects downstream communities in the Puget Sound region.
  • E. Yadkin Project
    The Yadkin Project is a hydroelectric power and reservoir system on the Yadkin River in North Carolina, managed for electricity generation, recreation, and water resource management.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Buffumville Lake project
Target entity description: Buffumville Lake project is a U.S. Army Corps of Engineers flood control and recreation development centered on Buffumville Lake in Massachusetts.
  • A. Nolin River Lake project
    The Nolin River Lake project is a U.S. Army Corps of Engineers flood-control and recreation initiative centered on Nolin River Lake in central Kentucky.
  • B. Tioga-Hammond Lakes flood control system
    The Tioga-Hammond Lakes flood control system is a U.S. Army Corps of Engineers project in north-central Pennsylvania that uses two interconnected reservoirs and dams to reduce flooding, provide recreation, and support water management along the Tioga River and surrounding region.
  • C. Rough River Dam project
    The Rough River Dam project is a U.S. Army Corps of Engineers flood-control and recreation initiative in Kentucky centered on the construction and management of Rough River Lake and its associated dam infrastructure.
  • D. Howard A. Hanson Dam project
    The Howard A. Hanson Dam project is a major flood-control and water management infrastructure initiative on Washington’s Green River that protects downstream communities in the Puget Sound region.
  • E. Yadkin Project
    The Yadkin Project is a hydroelectric power and reservoir system on the Yadkin River in North Carolina, managed for electricity generation, recreation, and water resource management.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51b014081908b263e167370529a completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e653c4a8a88190afc2f2cd1ebbbe1e completed April 20, 2026, 4:26 p.m.
Created at: April 10, 2026, 1:49 p.m.