Triple

T19791571
Position Surface form Disambiguated ID Type / Status
Subject Pont de Mirabeau E475423 entity
Predicate instanceOf P0 FINISHED
Object pont en arc métallique C462 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pont en arc métallique
Context triple: [Pont de Mirabeau, instanceOf, pont en arc métallique]
  • A. wrought-iron bridge
    A wrought-iron bridge is a structure for spanning physical obstacles, such as rivers or roads, whose primary load-bearing elements are made from wrought iron, valued historically for its toughness, malleability, and resistance to fatigue.
  • B. cast-iron bridge
    A cast-iron bridge is a structure whose primary load-bearing elements are made from cast iron, typically featuring modular, prefabricated components assembled to span a gap such as a river or roadway.
  • C. steel arch bridge chosen
    A steel arch bridge is a structure that uses a curved steel arch as its main load-bearing element to span a distance and support traffic above.
  • D. iron bridge
    An iron bridge is a structural crossing composed primarily of iron elements, designed to span physical obstacles such as rivers or valleys while supporting loads like vehicles, pedestrians, or trains.
  • E. stone arch bridge
    A stone arch bridge is a structure composed of curved stone arches that span a gap, using the compressive strength of masonry to support loads and provide passage over obstacles like rivers or valleys.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51b014081908b263e167370529a completed April 10, 2026, 11:55 a.m.
Created at: April 10, 2026, 1:49 p.m.