Triple
T1975486
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Walney Wind Farm |
E42899
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | power station |
C359
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: power station Context triple: [Walney Wind Farm, instanceOf, power station]
-
A.
renewable energy power station
A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
-
B.
steam pumping station
A steam pumping station is an industrial facility that uses steam-powered engines to drive pumps for moving water or other fluids, typically for municipal water supply, drainage, or industrial processes.
-
C.
wind power plant
chosen
A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
-
D.
power system
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
-
E.
wind power facility
A wind power facility is an installation that converts the kinetic energy of wind into electrical energy using one or more wind turbines, along with associated infrastructure for control, transmission, and maintenance.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8871289048190b00b0d7744b7b2b1 |
completed | March 4, 2026, 7:25 p.m. |
Created at: March 4, 2026, 7:36 p.m.