Triple

T1972808
Position Surface form Disambiguated ID Type / Status
Subject Oak Brook, Illinois E42838 entity
Predicate majorRoad P385 FINISHED
Object Interstate 294 E106534 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 294 | Statement: [Oak Brook, Illinois, majorRoad, Interstate 294]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 294
Context triple: [Oak Brook, Illinois, majorRoad, Interstate 294]
  • A. Interstate 294 chosen
    Interstate 294 is a major toll highway in the Chicago metropolitan area that forms part of the Tri-State Tollway, carrying traffic around the city and connecting key regional routes.
  • B. I-290
    I-290 is a major Interstate Highway in northeastern Illinois that serves as a key commuter route connecting Chicago with its western suburbs.
  • C. Interstate 494
    Interstate 494 is a major beltway highway forming part of the loop around the Minneapolis–Saint Paul metropolitan area in Minnesota.
  • D. Interstate 290
    Interstate 290 is a highway in Massachusetts that serves as a key connector between Worcester and the surrounding regional interstate network.
  • E. Interstate 290
    Interstate 290 is a highway in western New York that serves as a key connector between Buffalo’s suburbs and major regional routes.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8871289048190b00b0d7744b7b2b1 completed March 4, 2026, 7:25 p.m.
NER Named-entity recognition batch_69abb3f477988190b0165fc46b1cccfd completed March 7, 2026, 5:13 a.m.
NED1 Entity disambiguation (via context triple) batch_69b48810202c8190a2a8d5ae849b6d9e completed March 13, 2026, 9:56 p.m.
Created at: March 4, 2026, 7:36 p.m.