Triple

T19677273
Position Surface form Disambiguated ID Type / Status
Subject Jalal-Abad Region E472486 entity
Predicate hasHydropowerPlant P15311 FINISHED
Object Kara-Köl Hydroelectric Power Station NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kara-Köl Hydroelectric Power Station | Statement: [Jalal-Abad Region, hasHydropowerPlant, Kara-Köl Hydroelectric Power Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kara-Köl Hydroelectric Power Station
Context triple: [Jalal-Abad Region, hasHydropowerPlant, Kara-Köl Hydroelectric Power Station]
  • A. Baksan Hydroelectric Power Station
    The Baksan Hydroelectric Power Station is a hydroelectric facility in Russia’s Kabardino-Balkaria region that generates electricity using the flow of the Baksan River.
  • B. Uglich Hydroelectric Station
    Uglich Hydroelectric Station is a hydroelectric power plant on the Volga River in Russia, forming part of the Volga–Kama cascade and providing electricity generation and water regulation for the region.
  • C. Er'tan Hydropower Station
    Er'tan Hydropower Station is a major hydroelectric power facility in Sichuan, China, known for its large arch dam and role in regional power generation and tourism.
  • D. Khrami II Hydroelectric Power Plant
    Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • E. Cheboksary Hydroelectric Station
    Cheboksary Hydroelectric Station is a major hydroelectric power plant on the Volga River in Russia, forming part of the Volga–Kama cascade and providing electricity generation, navigation support, and water regulation for the region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Kara-Köl Hydroelectric Power Station
Target entity description: Kara-Köl Hydroelectric Power Station is a major hydroelectric facility in Kyrgyzstan that harnesses the Naryn River to generate electricity for the region and the national grid.
  • A. Baksan Hydroelectric Power Station
    The Baksan Hydroelectric Power Station is a hydroelectric facility in Russia’s Kabardino-Balkaria region that generates electricity using the flow of the Baksan River.
  • B. Uglich Hydroelectric Station
    Uglich Hydroelectric Station is a hydroelectric power plant on the Volga River in Russia, forming part of the Volga–Kama cascade and providing electricity generation and water regulation for the region.
  • C. Er'tan Hydropower Station
    Er'tan Hydropower Station is a major hydroelectric power facility in Sichuan, China, known for its large arch dam and role in regional power generation and tourism.
  • D. Khrami II Hydroelectric Power Plant
    Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • E. Cheboksary Hydroelectric Station
    Cheboksary Hydroelectric Station is a major hydroelectric power plant on the Volga River in Russia, forming part of the Volga–Kama cascade and providing electricity generation, navigation support, and water regulation for the region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e514f2e08190ba70a4449519d218 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e641bceef881909c5b655af709c8c6 completed April 20, 2026, 3:09 p.m.
Created at: April 10, 2026, 1:45 p.m.