Triple
T19640800
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gold River, California |
E471526
|
entity |
| Predicate | hasNearbyAttraction |
P2064
|
FINISHED |
| Object | Nimbus Dam and Lake Natoma |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nimbus Dam and Lake Natoma | Statement: [Gold River, California, hasNearbyAttraction, Nimbus Dam and Lake Natoma]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Nimbus Dam and Lake Natoma Context triple: [Gold River, California, hasNearbyAttraction, Nimbus Dam and Lake Natoma]
-
A.
Yuba Dam
Yuba Dam is a water-control structure in Utah that impounds the Sevier River to form Yuba Reservoir for irrigation, recreation, and flood management.
-
B.
Leaburg Dam
Leaburg Dam is a historic hydroelectric dam on Oregon’s McKenzie River that generates power and helps regulate river flow.
-
C.
Red Bluff Dam
Red Bluff Dam is a major irrigation and water storage structure on the Pecos River in West Texas, forming Red Bluff Reservoir to support agriculture and regional water management.
-
D.
O'Shaughnessy Dam
O'Shaughnessy Dam is a concrete arch-gravity dam in Yosemite National Park that creates the Hetch Hetchy Reservoir, supplying water and hydroelectric power to the San Francisco Bay Area.
-
E.
John Day Dam
John Day Dam is a large hydroelectric dam on the Columbia River in the Pacific Northwest, known for its significant power generation capacity and role in regional navigation and water management.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Nimbus Dam and Lake Natoma Target entity description: Nimbus Dam and Lake Natoma form a popular recreational area on the American River near Sacramento, known for boating, fishing, kayaking, and scenic trails.
-
A.
Yuba Dam
Yuba Dam is a water-control structure in Utah that impounds the Sevier River to form Yuba Reservoir for irrigation, recreation, and flood management.
-
B.
Leaburg Dam
Leaburg Dam is a historic hydroelectric dam on Oregon’s McKenzie River that generates power and helps regulate river flow.
-
C.
Red Bluff Dam
Red Bluff Dam is a major irrigation and water storage structure on the Pecos River in West Texas, forming Red Bluff Reservoir to support agriculture and regional water management.
-
D.
O'Shaughnessy Dam
O'Shaughnessy Dam is a concrete arch-gravity dam in Yosemite National Park that creates the Hetch Hetchy Reservoir, supplying water and hydroelectric power to the San Francisco Bay Area.
-
E.
John Day Dam
John Day Dam is a large hydroelectric dam on the Columbia River in the Pacific Northwest, known for its significant power generation capacity and role in regional navigation and water management.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e511f28481909f4bc3ea9191e54a |
completed | April 10, 2026, 11:54 a.m. |
| NER | Named-entity recognition | batch_69e6412224d481909524d7654a36d49b |
completed | April 20, 2026, 3:07 p.m. |
Created at: April 10, 2026, 1:44 p.m.