Triple

T19620908
Position Surface form Disambiguated ID Type / Status
Subject Wall Drawing #260 E471003 entity
Predicate instanceOf P0 FINISHED
Object instruction-based artwork C477 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: instruction-based artwork
Context triple: [Wall Drawing #260, instanceOf, instruction-based artwork]
  • A. public art program
    A public art program is an organized initiative, typically led by a government or institution, that commissions, funds, and manages artworks in public spaces to enhance community identity, cultural expression, and shared environments.
  • B. work of art chosen
    A work of art is a deliberately created object, performance, or experience intended to express ideas or emotions and to be perceived and interpreted aesthetically.
  • C. artistic style
    An artistic style is a distinctive and recognizable manner of expression in art, characterized by specific techniques, forms, and aesthetic choices that differentiate one body of work, artist, or movement from another.
  • D. visual arts program
    A visual arts program is an organized course of study or series of activities designed to develop skills, knowledge, and creative expression in disciplines such as drawing, painting, sculpture, and digital media.
  • E. art studio
    An art studio is a dedicated space equipped with tools, materials, and appropriate lighting where artists create, experiment with, and refine their artwork.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e510fa248190b7afb274a1d4cf73 completed April 10, 2026, 11:54 a.m.
Created at: April 10, 2026, 1:43 p.m.