Triple
T1960040
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Columbus Day |
E42363
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | federal holiday |
C287
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: federal holiday Context triple: [Columbus Day, instanceOf, federal holiday]
-
A.
national holiday
A national holiday is a legally recognized day of celebration or commemoration on which a nation collectively observes significant historical, cultural, or religious events, often with reduced work and school obligations.
-
B.
U.S. federal holiday
chosen
A U.S. federal holiday is an officially designated day on which non-essential federal government offices are closed and most federal employees are given paid leave, often accompanied by nationwide observances or commemorations.
-
C.
public holiday
A public holiday is a legally designated day on which work and school are generally suspended to allow the population to observe cultural, historical, religious, or national events.
-
D.
holiday standard
A holiday standard is a widely recognized and repeatedly celebrated song, film, or tradition that recurs each holiday season and is culturally regarded as timeless.
-
E.
memorial day
Memorial Day is a U.S. federal holiday observed on the last Monday of May to honor and remember military personnel who have died in service to their country.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8870eea088190a38781990812a9bc |
completed | March 4, 2026, 7:25 p.m. |
Created at: March 4, 2026, 7:36 p.m.