Triple

T1958724
Position Surface form Disambiguated ID Type / Status
Subject Metro Viveros / Derechos Humanos E42331 entity
Predicate instanceOf P0 FINISHED
Object Mexico City Metro station C463 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Mexico City Metro station
Context triple: [Metro Viveros / Derechos Humanos, instanceOf, Mexico City Metro station]
  • A. AeroTrain station
    An AeroTrain station is a designated facility where passengers board, disembark, and transfer between AeroTrains, providing platforms, ticketing, waiting areas, and related services for high-speed or automated airport rail transit.
  • B. Maya city
    A Maya city is a pre-Columbian urban center of the Maya civilization characterized by monumental architecture, complex social and political organization, and integration with surrounding agricultural and ritual landscapes.
  • C. public transit station
    A public transit station is a designated facility where passengers can access, board, transfer between, and disembark from public transportation services such as buses, trains, or subways.
  • D. rapid transit station chosen
    A rapid transit station is a designated facility where passengers board, alight, and transfer between high-frequency urban rail or metro services, typically featuring platforms, ticketing areas, and access to surrounding streets or other transport modes.
  • E. light-rail station
    A light-rail station is a designated facility where light-rail vehicles stop to allow passengers to board, alight, and transfer between services, typically featuring platforms, shelters, signage, and ticketing amenities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8870eea088190a38781990812a9bc completed March 4, 2026, 7:25 p.m.
Created at: March 4, 2026, 7:36 p.m.