Triple

T19555671
Position Surface form Disambiguated ID Type / Status
Subject Enguri Dam E489302 entity
Predicate partOf P40 FINISHED
Object Enguri Hydroelectric Power Plant complex NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Enguri Hydroelectric Power Plant complex | Statement: [Enguri Dam, partOf, Enguri Hydroelectric Power Plant complex]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Enguri Hydroelectric Power Plant complex
Context triple: [Enguri Dam, partOf, Enguri Hydroelectric Power Plant complex]
  • A. Aragvi River hydroelectric system
    The Aragvi River hydroelectric system is a network of dams, reservoirs, and power stations on Georgia’s Aragvi River that generates hydroelectric power and regulates water resources for the region.
  • B. Mingachevir Hydroelectric Power Station
    Mingachevir Hydroelectric Power Station is a major hydroelectric power plant on the Kura River in Azerbaijan, serving as one of the country’s largest sources of electricity generation.
  • C. Baksan Hydroelectric Power Station
    The Baksan Hydroelectric Power Station is a hydroelectric facility in Russia’s Kabardino-Balkaria region that generates electricity using the flow of the Baksan River.
  • D. Enguri Dam
    Enguri Dam is a massive arch dam in western Georgia, notable as one of the tallest concrete arch dams in the world and a key source of hydroelectric power for the region.
  • E. Shaori–Tskhinvali hydroelectric system
    The Shaori–Tskhinvali hydroelectric system is a Georgian hydroelectric power complex that uses water from the Shaori Reservoir and related infrastructure to generate electricity for the surrounding region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Enguri Hydroelectric Power Plant complex
Target entity description: The Enguri Hydroelectric Power Plant complex is a major hydroelectric generation facility in western Georgia centered on the Enguri River, known for its large-scale dam and key role in the region’s electricity supply.
  • A. Aragvi River hydroelectric system
    The Aragvi River hydroelectric system is a network of dams, reservoirs, and power stations on Georgia’s Aragvi River that generates hydroelectric power and regulates water resources for the region.
  • B. Mingachevir Hydroelectric Power Station
    Mingachevir Hydroelectric Power Station is a major hydroelectric power plant on the Kura River in Azerbaijan, serving as one of the country’s largest sources of electricity generation.
  • C. Baksan Hydroelectric Power Station
    The Baksan Hydroelectric Power Station is a hydroelectric facility in Russia’s Kabardino-Balkaria region that generates electricity using the flow of the Baksan River.
  • D. Enguri Dam chosen
    Enguri Dam is a massive arch dam in western Georgia, notable as one of the tallest concrete arch dams in the world and a key source of hydroelectric power for the region.
  • E. Shaori–Tskhinvali hydroelectric system
    The Shaori–Tskhinvali hydroelectric system is a Georgian hydroelectric power complex that uses water from the Shaori Reservoir and related infrastructure to generate electricity for the surrounding region.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8dc5d8c8190a6d7bd8864f43ca0 completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e63d335f888190abfc5ba974d3c65e completed April 20, 2026, 2:50 p.m.
Created at: April 10, 2026, 1:42 p.m.