Triple

T19548844
Position Surface form Disambiguated ID Type / Status
Subject Jirau Dam E489144 entity
Predicate regulatingAuthority P760 FINISHED
Object Brazilian National Electric Energy Agency NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Brazilian National Electric Energy Agency | Statement: [Jirau Dam, regulatingAuthority, Brazilian National Electric Energy Agency]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Brazilian National Electric Energy Agency
Context triple: [Jirau Dam, regulatingAuthority, Brazilian National Electric Energy Agency]
  • A. Furnas Centrais Elétricas
    Furnas Centrais Elétricas is a major Brazilian state-controlled electric utility company focused on the generation and transmission of hydroelectric power.
  • B. Ministry of Mines and Energy (Brazil)
    The Ministry of Mines and Energy (Brazil) is the federal government body responsible for formulating and implementing national policies for mining, electricity, oil, natural gas, and other energy resources in Brazil.
  • C. Santo Antônio Energia
    Santo Antônio Energia is a Brazilian energy company responsible for operating and managing the Santo Antônio hydroelectric power plant on the Madeira River.
  • D. CPFL Energia
    CPFL Energia is a major Brazilian electric utility company engaged in the generation, distribution, and commercialization of electricity across multiple regions of Brazil.
  • E. Brazilian National Interconnected System
    The Brazilian National Interconnected System is the nationwide electricity grid that links most of Brazil’s power plants and regions into a single, integrated power network.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Brazilian National Electric Energy Agency
Target entity description: The Brazilian National Electric Energy Agency is the federal regulatory body responsible for overseeing and regulating Brazil’s electricity sector, including generation, transmission, distribution, and commercialization of electric power.
  • A. Furnas Centrais Elétricas
    Furnas Centrais Elétricas is a major Brazilian state-controlled electric utility company focused on the generation and transmission of hydroelectric power.
  • B. Ministry of Mines and Energy (Brazil)
    The Ministry of Mines and Energy (Brazil) is the federal government body responsible for formulating and implementing national policies for mining, electricity, oil, natural gas, and other energy resources in Brazil.
  • C. Santo Antônio Energia
    Santo Antônio Energia is a Brazilian energy company responsible for operating and managing the Santo Antônio hydroelectric power plant on the Madeira River.
  • D. CPFL Energia
    CPFL Energia is a major Brazilian electric utility company engaged in the generation, distribution, and commercialization of electricity across multiple regions of Brazil.
  • E. Brazilian National Interconnected System
    The Brazilian National Interconnected System is the nationwide electricity grid that links most of Brazil’s power plants and regions into a single, integrated power network.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8dc5d8c8190a6d7bd8864f43ca0 completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e63d2e5e588190ac3a6f612d4fb54b completed April 20, 2026, 2:50 p.m.
Created at: April 10, 2026, 1:41 p.m.