Triple

T19548815
Position Surface form Disambiguated ID Type / Status
Subject Jirau Dam E489144 entity
Predicate partOf P40 FINISHED
Object Madeira River hydroelectric complex NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Madeira River hydroelectric complex | Statement: [Jirau Dam, partOf, Madeira River hydroelectric complex]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Madeira River hydroelectric complex
Context triple: [Jirau Dam, partOf, Madeira River hydroelectric complex]
  • A. Madeira River energy complex chosen
    The Madeira River energy complex is a large hydroelectric development in Brazil that encompasses multiple dams and related infrastructure to harness the energy potential of the Madeira River.
  • B. Paulo Afonso Hydroelectric Complex
    The Paulo Afonso Hydroelectric Complex is a major Brazilian hydroelectric power facility on the São Francisco River, known for its large cascade of dams and significant contribution to the country’s electricity supply.
  • C. Belo Monte Dam
    The Belo Monte Dam is a massive hydroelectric complex in Brazil’s Amazon region, known for its high power capacity and significant environmental and social controversy.
  • D. Paraná River hydroelectric system
    The Paraná River hydroelectric system is a network of large dams and power stations along the Paraná River that collectively form one of South America’s most important sources of renewable electricity.
  • E. Santo Antônio Dam
    Santo Antônio Dam is a large hydroelectric power plant in Brazil, built on the Madeira River near Porto Velho to generate electricity as part of the Madeira River energy complex.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8dc5d8c8190a6d7bd8864f43ca0 completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e63d2e5e588190ac3a6f612d4fb54b completed April 20, 2026, 2:50 p.m.
Created at: April 10, 2026, 1:41 p.m.