Triple

T19540639
Position Surface form Disambiguated ID Type / Status
Subject Pier 59 E488889 entity
Predicate instanceOf P0 FINISHED
Object photography studio complex C12027 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: photography studio complex
Context triple: [Pier 59, instanceOf, photography studio complex]
  • A. television studio complex
    A television studio complex is a purpose-built facility that houses multiple studios, control rooms, production offices, technical infrastructure, and support spaces for creating, recording, and broadcasting television content.
  • B. artists' studio building chosen
    A building designed or adapted to provide individual or shared workspaces, facilities, and supportive environments for artists to create, display, and sometimes sell their work.
  • C. creative and digital business complex
    A creative and digital business complex is an integrated hub that houses technology-driven, design-focused, and media-oriented enterprises, providing shared infrastructure and collaborative spaces to foster innovation, production, and commercialization of digital and creative services.
  • D. entertainment complex
    An entertainment complex is a large, multi-purpose facility that combines various leisure, recreational, and cultural attractions—such as cinemas, theaters, restaurants, gaming areas, and event spaces—within a single integrated venue.
  • E. conservatory complex
    A conservatory complex is a group of interconnected glass or partially enclosed structures designed for cultivating, displaying, and studying plants in controlled environmental conditions, often integrated with educational and recreational facilities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8db5b6c8190984b61f91981f575 completed April 10, 2026, 12:11 p.m.
Created at: April 10, 2026, 1:41 p.m.