Triple
T1946407
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | transport policy of Moscow |
E42063
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban transport policy |
C1801
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban transport policy Context triple: [transport policy of Moscow, instanceOf, urban transport policy]
-
A.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
B.
urban development
Urban development is the planned growth and improvement of cities and towns through the design, regulation, and construction of buildings, infrastructure, and public spaces to support economic, social, and environmental needs.
-
C.
public transit system
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
-
D.
rail transit
Rail transit is a public transportation system that moves passengers or freight along fixed steel tracks using trains, subways, trams, or light rail vehicles, typically in urban or intercity corridors.
-
E.
transport policy body
chosen
A transport policy body is an organization or authority responsible for developing, coordinating, and overseeing regulations, strategies, and standards that govern transportation systems and services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8870e08fc8190a319cbf2600db15f |
completed | March 4, 2026, 7:25 p.m. |
Created at: March 4, 2026, 7:36 p.m.