Triple
T19463159
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Karasuma Line |
E486924
|
entity |
| Predicate | hasRollingStock |
P1305
|
FINISHED |
| Object | Kyoto Municipal Subway 20 series |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kyoto Municipal Subway 20 series | Statement: [Karasuma Line, hasRollingStock, Kyoto Municipal Subway 20 series]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Kyoto Municipal Subway 20 series Context triple: [Karasuma Line, hasRollingStock, Kyoto Municipal Subway 20 series]
-
A.
Kyoto Municipal Subway 10 series
The Kyoto Municipal Subway 10 series is a fleet of electric multiple unit trains operated on Kyoto’s Karasuma Line, known for their stainless-steel bodies and use in urban rapid transit service.
-
B.
Osaka Metro 20 series
The Osaka Metro 20 series is a type of electric multiple unit train used on Osaka's subway network, known for its stainless-steel construction and service on several key lines.
-
C.
Osaka Metro 21 series
The Osaka Metro 21 series is a type of electric multiple unit train used on Osaka’s subway network, known for its stainless-steel body and service on several key urban lines.
-
D.
Osaka Metro 24 series
The Osaka Metro 24 series is a type of electric multiple unit train used for urban rapid transit services on Osaka’s subway network.
-
E.
Osaka Metro 23 series
The Osaka Metro 23 series is a type of electric multiple unit train operated on Osaka’s subway network, specifically serving the Yotsubashi Line.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Kyoto Municipal Subway 20 series Target entity description: The Kyoto Municipal Subway 20 series is a type of electric multiple unit train used on Kyoto’s subway system, known for its modern design and operation on the Karasuma Line.
-
A.
Kyoto Municipal Subway 10 series
The Kyoto Municipal Subway 10 series is a fleet of electric multiple unit trains operated on Kyoto’s Karasuma Line, known for their stainless-steel bodies and use in urban rapid transit service.
-
B.
Osaka Metro 20 series
The Osaka Metro 20 series is a type of electric multiple unit train used on Osaka's subway network, known for its stainless-steel construction and service on several key lines.
-
C.
Osaka Metro 21 series
The Osaka Metro 21 series is a type of electric multiple unit train used on Osaka’s subway network, known for its stainless-steel body and service on several key urban lines.
-
D.
Osaka Metro 24 series
The Osaka Metro 24 series is a type of electric multiple unit train used for urban rapid transit services on Osaka’s subway network.
-
E.
Osaka Metro 23 series
The Osaka Metro 23 series is a type of electric multiple unit train operated on Osaka’s subway network, specifically serving the Yotsubashi Line.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d86d608190bd199a98d0297f27 |
completed | April 10, 2026, 12:11 p.m. |
| NER | Named-entity recognition | batch_69e633cf95988190b13b2153e67d0cac |
completed | April 20, 2026, 2:10 p.m. |
Created at: April 10, 2026, 1:38 p.m.