Triple

T19449007
Position Surface form Disambiguated ID Type / Status
Subject Santo Antônio Dam E486561 entity
Predicate locatedUpstreamFrom P5955 FINISHED
Object Jirau Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jirau Dam | Statement: [Santo Antônio Dam, locatedUpstreamFrom, Jirau Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Jirau Dam
Context triple: [Santo Antônio Dam, locatedUpstreamFrom, Jirau Dam]
  • A. Jirau Dam chosen
    Jirau Dam is a large hydroelectric power plant in Brazil, built on the Madeira River as part of the country’s major Amazon basin energy infrastructure.
  • B. Shiroro Dam
    Shiroro Dam is a major hydroelectric power facility on the Kaduna River in Niger State, Nigeria, supplying electricity and supporting water management in the region.
  • C. Lodoyo Dam
    Lodoyo Dam is a water control and irrigation structure located on the Brantas River in East Java, Indonesia.
  • D. Pubugou Dam
    Pubugou Dam is a large hydroelectric gravity dam in Sichuan, China, known for its significant power generation capacity and its role in flood control and regional development along the Dadu River.
  • E. Tilaiya Dam
    Tilaiya Dam is a multipurpose masonry dam in Jharkhand, India, built as part of the Damodar Valley Corporation project to provide hydroelectric power, irrigation, and flood control.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d7ad488190a3373045029b0f3b completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e6338be5a48190973d9ecae853900c completed April 20, 2026, 2:09 p.m.
Created at: April 10, 2026, 1:38 p.m.