Triple
T19448988
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Santo Antônio Dam |
E486561
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object | Madeira River energy complex |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Madeira River energy complex | Statement: [Santo Antônio Dam, partOf, Madeira River energy complex]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Madeira River energy complex Context triple: [Santo Antônio Dam, partOf, Madeira River energy complex]
-
A.
Paulo Afonso Hydroelectric Complex
The Paulo Afonso Hydroelectric Complex is a major Brazilian hydroelectric power facility on the São Francisco River, known for its large cascade of dams and significant contribution to the country’s electricity supply.
-
B.
Paraná River hydroelectric system
The Paraná River hydroelectric system is a network of large dams and power stations along the Paraná River that collectively form one of South America’s most important sources of renewable electricity.
-
C.
Belo Monte Dam
The Belo Monte Dam is a massive hydroelectric complex in Brazil’s Amazon region, known for its high power capacity and significant environmental and social controversy.
-
D.
Funil Hydroelectric Plant
The Funil Hydroelectric Plant is a Brazilian power station that generates electricity from the waters of the Paraíba do Sul River.
-
E.
Maria Cristina Hydroelectric Plant
The Maria Cristina Hydroelectric Plant is a major hydroelectric power facility in the Philippines, known for harnessing the Maria Cristina Falls to supply electricity to Mindanao.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Madeira River energy complex Target entity description: The Madeira River energy complex is a large hydroelectric development in Brazil that encompasses multiple dams and related infrastructure to harness the energy potential of the Madeira River.
-
A.
Paulo Afonso Hydroelectric Complex
The Paulo Afonso Hydroelectric Complex is a major Brazilian hydroelectric power facility on the São Francisco River, known for its large cascade of dams and significant contribution to the country’s electricity supply.
-
B.
Paraná River hydroelectric system
The Paraná River hydroelectric system is a network of large dams and power stations along the Paraná River that collectively form one of South America’s most important sources of renewable electricity.
-
C.
Belo Monte Dam
The Belo Monte Dam is a massive hydroelectric complex in Brazil’s Amazon region, known for its high power capacity and significant environmental and social controversy.
-
D.
Funil Hydroelectric Plant
The Funil Hydroelectric Plant is a Brazilian power station that generates electricity from the waters of the Paraíba do Sul River.
-
E.
Maria Cristina Hydroelectric Plant
The Maria Cristina Hydroelectric Plant is a major hydroelectric power facility in the Philippines, known for harnessing the Maria Cristina Falls to supply electricity to Mindanao.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d7ad488190a3373045029b0f3b |
completed | April 10, 2026, 12:11 p.m. |
| NER | Named-entity recognition | batch_69e6338be5a48190973d9ecae853900c |
completed | April 20, 2026, 2:09 p.m. |
Created at: April 10, 2026, 1:38 p.m.