Triple

T19442613
Position Surface form Disambiguated ID Type / Status
Subject Empresa de Energía de Chubut E486387 entity
Predicate abbreviation P43 FINISHED
Object Energía de Chubut NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Energía de Chubut | Statement: [Empresa de Energía de Chubut, abbreviation, Energía de Chubut]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Energía de Chubut
Context triple: [Empresa de Energía de Chubut, abbreviation, Energía de Chubut]
  • A. Comahue hydroelectric complex
    The Comahue hydroelectric complex is a major system of dams and power plants in Argentina’s Comahue region that harnesses the flow of rivers such as the Limay to generate electricity.
  • B. Chañaral
    Chañaral is a coastal city in northern Chile known historically for its mining activity and its location along the Atacama Desert shoreline.
  • C. Empresa de Energía de Chubut chosen
    Empresa de Energía de Chubut is a provincial energy company in Argentina responsible for generating and distributing electricity in the Chubut region.
  • D. Horcasitas
    Horcasitas is a Spanish surname historically associated with nobility and colonial administration in New Spain.
  • E. HidroAysén
    HidroAysén was a controversial large-scale hydroelectric project proposal in Chilean Patagonia that aimed to build multiple dams on remote rivers, sparking significant environmental and social opposition.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d7ad488190a3373045029b0f3b completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e63386c520819092bea5d7f259a226 completed April 20, 2026, 2:09 p.m.
Created at: April 10, 2026, 1:38 p.m.