Triple
T19438101
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Boulder Canyon Project Act |
E486276
|
entity |
| Predicate | authorizedProject |
P135892
|
FINISHED |
| Object | Boulder Canyon Project |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Boulder Canyon Project | Statement: [Boulder Canyon Project Act, authorizedProject, Boulder Canyon Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Boulder Canyon Project Context triple: [Boulder Canyon Project Act, authorizedProject, Boulder Canyon Project]
-
A.
Boulder Canyon Project
chosen
The Boulder Canyon Project was a major U.S. federal public works initiative of the early 20th century that authorized and funded the construction of Hoover Dam and related infrastructure on the Colorado River for flood control, irrigation, and hydroelectric power.
-
B.
Shoshone Project
The Shoshone Project is a U.S. Bureau of Reclamation irrigation and water management development in Wyoming that harnesses the Shoshone River through dams, reservoirs, and canals to support agriculture and regional growth.
-
C.
Columbia Basin Project
The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
-
D.
Rio Grande Project
The Rio Grande Project is a major U.S. Bureau of Reclamation irrigation and water management initiative on the Rio Grande that supplies water for agriculture, municipalities, and flood control in southern New Mexico and western Texas.
-
E.
Hells Canyon Project
The Hells Canyon Project is a hydroelectric power complex on the Snake River consisting of multiple dams and reservoirs that generate electricity and provide water management in the Hells Canyon area.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: authorizedProject Context triple: [Boulder Canyon Project Act, authorizedProject, Boulder Canyon Project]
-
A.
authorizedOn
Indicates that an entity has been granted official permission or rights to act, access, or operate on a specified object, resource, or context.
-
B.
eligibleProject
Indicates that a project satisfies the required conditions or criteria to qualify for a particular status, process, or benefit.
-
C.
authorizesProgram
Indicates that one entity grants official permission for a particular program to exist, operate, or proceed.
-
D.
authorizedIn
Indicates that an entity has been granted official permission or legal authority to act, operate, or be valid within a specified context, domain, or jurisdiction.
-
E.
authorizedUnderProgram
Indicates that an entity’s action, status, or participation is permitted or governed according to the rules or provisions of a specific program.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d7ad488190a3373045029b0f3b |
completed | April 10, 2026, 12:11 p.m. |
| NER | Named-entity recognition | batch_69e6336281b88190b1e5ad2606d7c314 |
completed | April 20, 2026, 2:08 p.m. |
| PD | Predicate disambiguation | batch_69e4fd6e806081909053f325ba01ab6b |
completed | April 19, 2026, 4:06 p.m. |
| PDg | Predicate description generation | batch_69e5004c23308190a087b7941a90725f |
completed | April 19, 2026, 4:18 p.m. |
Created at: April 10, 2026, 1:38 p.m.