Triple
T1943489
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Delaware Aqueduct |
E42008
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | wire suspension bridge |
C402
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: wire suspension bridge Context triple: [Delaware Aqueduct, instanceOf, wire suspension bridge]
-
A.
suspension bridge
chosen
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
-
B.
cantilever bridge
A cantilever bridge is a structure that spans a distance using projecting beams or trusses anchored at only one end, which extend outward to support the bridge deck without intermediate supports.
-
C.
cable-stayed bridge
A cable-stayed bridge is a type of bridge in which the deck is directly supported by multiple cables connected to one or more towers or pylons, efficiently distributing loads and allowing for long spans with a distinctive, fan-like or harp-like appearance.
-
D.
truss bridge
A truss bridge is a type of bridge whose load-bearing superstructure is composed of a framework of interconnected triangular units that efficiently distribute forces through tension and compression.
-
E.
steel arch bridge
A steel arch bridge is a structure that uses a curved steel arch as its main load-bearing element to span a distance and support traffic above.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8870e08fc8190a319cbf2600db15f |
completed | March 4, 2026, 7:25 p.m. |
Created at: March 4, 2026, 7:36 p.m.