Triple

T19433943
Position Surface form Disambiguated ID Type / Status
Subject Oracle Container Engine for Kubernetes E486184 entity
Predicate controlPlaneCost P17476 FINISHED
Object no additional charge for managed control plane LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: no additional charge for managed control plane | Statement: [Oracle Container Engine for Kubernetes, controlPlaneCost, no additional charge for managed control plane]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: controlPlaneCost
Context triple: [Oracle Container Engine for Kubernetes, controlPlaneCost, no additional charge for managed control plane]
  • A. controlPlaneType
    Indicates the type or mode of control plane used to manage and coordinate the system’s components or network operations.
  • B. costModel chosen
    Indicates the pricing or cost-structure relationship applied to an entity, defining how its costs are calculated or charged.
  • C. controlPlaneEntity
    Indicates that one entity functions as part of, or in association with, a system’s control plane, managing or coordinating control-related operations for that system.
  • D. economicCost
    Indicates the financial burden, expense, or resource expenditure associated with an action, event, or relationship between entities.
  • E. costsProvision
    Indicates that providing a particular good, service, or resource requires incurring a specified cost.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d7ad488190a3373045029b0f3b completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e6335dae10819096e1825741f814ed completed April 20, 2026, 2:08 p.m.
PD Predicate disambiguation batch_69e4fd6e806081909053f325ba01ab6b completed April 19, 2026, 4:06 p.m.
Created at: April 10, 2026, 1:37 p.m.