Triple

T19398530
Position Surface form Disambiguated ID Type / Status
Subject Tesla Virtual Power Plant solutions E485253 entity
Predicate controlledBy P1715 FINISHED
Object Tesla Energy operations center NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tesla Energy operations center | Statement: [Tesla Virtual Power Plant solutions, controlledBy, Tesla Energy operations center]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tesla Energy operations center
Context triple: [Tesla Virtual Power Plant solutions, controlledBy, Tesla Energy operations center]
  • A. Tesla Gigafactory network
    The Tesla Gigafactory network is a global system of large-scale manufacturing plants dedicated to producing electric vehicles, batteries, and related components to support Tesla’s clean energy and transportation ecosystem.
  • B. Tesla Fremont Factory
    Tesla Fremont Factory is the company’s flagship electric vehicle manufacturing plant in Fremont, California, where multiple Tesla models are produced and new vehicle platforms are industrialized.
  • C. Tesla Powerpack
    Tesla Powerpack is a commercial and utility-scale lithium-ion battery energy storage system designed to store electricity, support grid stability, and enable large-scale renewable energy integration.
  • D. Tesla Powerwall
    The Tesla Powerwall is a rechargeable home battery system designed to store energy from solar panels or the grid for backup power and load shifting.
  • E. Tesla Megapack
    The Tesla Megapack is a large-scale, utility-grade lithium-ion battery system designed to store energy for the electrical grid and support renewable power integration.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Tesla Energy operations center
Target entity description: The Tesla Energy operations center is a centralized control hub that monitors, coordinates, and optimizes Tesla’s distributed energy resources and virtual power plant networks.
  • A. Tesla Gigafactory network
    The Tesla Gigafactory network is a global system of large-scale manufacturing plants dedicated to producing electric vehicles, batteries, and related components to support Tesla’s clean energy and transportation ecosystem.
  • B. Tesla Fremont Factory
    Tesla Fremont Factory is the company’s flagship electric vehicle manufacturing plant in Fremont, California, where multiple Tesla models are produced and new vehicle platforms are industrialized.
  • C. Tesla Powerpack
    Tesla Powerpack is a commercial and utility-scale lithium-ion battery energy storage system designed to store electricity, support grid stability, and enable large-scale renewable energy integration.
  • D. Tesla Powerwall
    The Tesla Powerwall is a rechargeable home battery system designed to store energy from solar panels or the grid for backup power and load shifting.
  • E. Tesla Megapack
    The Tesla Megapack is a large-scale, utility-grade lithium-ion battery system designed to store energy for the electrical grid and support renewable power integration.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d5162481909db12435d9535c1a completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e62575d78881909c2cfee799859261 completed April 20, 2026, 1:09 p.m.
Created at: April 10, 2026, 1:36 p.m.