Triple
T19397979
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tesla cloud services |
E485242
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | online infrastructure |
C3206
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: online infrastructure Context triple: [Tesla cloud services, instanceOf, online infrastructure]
-
A.
internet infrastructure component
An internet infrastructure component is a foundational hardware or software element—such as routers, switches, servers, cables, or protocols—that enables the transmission, routing, and reliable delivery of data across interconnected networks.
-
B.
infrastructure
chosen
Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
-
C.
open infrastructure provider
An open infrastructure provider is an organization that offers transparent, interoperable, and often open-source-based computing, networking, or platform resources that others can build upon, extend, and integrate without proprietary lock-in.
-
D.
Internet infrastructure database
A centralized repository that stores, organizes, and manages detailed information about the components, configurations, and relationships of internet infrastructure such as networks, servers, domains, and routing resources.
-
E.
activation server infrastructure
The activation server infrastructure is the backend system that securely manages, validates, and tracks software or service activation requests across clients and environments.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d5162481909db12435d9535c1a |
completed | April 10, 2026, 12:11 p.m. |
Created at: April 10, 2026, 1:36 p.m.