Triple
T19370239
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hamilton docks |
E484514
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | harbour infrastructure |
C16149
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: harbour infrastructure Context triple: [Hamilton docks, instanceOf, harbour infrastructure]
-
A.
maritime structure
chosen
A maritime structure is a man-made construction located in or near bodies of water, designed to support marine activities such as navigation, transportation, resource extraction, or coastal protection.
-
B.
harbour expansion
Harbour expansion is the planned enlargement and enhancement of a port’s physical infrastructure and operational capacity to accommodate increased maritime traffic, larger vessels, and associated economic activities.
-
C.
harbor
A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
-
D.
coastal harbour
A coastal harbour is a sheltered area along a shoreline where the sea meets the land, providing safe anchorage and facilities for ships and boats to dock, load, and unload.
-
E.
docking facility
A docking facility is a designated structure or area where vehicles, vessels, or spacecraft securely attach for loading, unloading, maintenance, or passenger transfer.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d305088190ad13571532aa454c |
completed | April 10, 2026, 12:10 p.m. |
Created at: April 10, 2026, 1:35 p.m.