Triple

T19370239
Position Surface form Disambiguated ID Type / Status
Subject Hamilton docks E484514 entity
Predicate instanceOf P0 FINISHED
Object harbour infrastructure C16149 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: harbour infrastructure
Context triple: [Hamilton docks, instanceOf, harbour infrastructure]
  • A. maritime structure chosen
    A maritime structure is a man-made construction located in or near bodies of water, designed to support marine activities such as navigation, transportation, resource extraction, or coastal protection.
  • B. harbour expansion
    Harbour expansion is the planned enlargement and enhancement of a port’s physical infrastructure and operational capacity to accommodate increased maritime traffic, larger vessels, and associated economic activities.
  • C. harbor
    A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
  • D. coastal harbour
    A coastal harbour is a sheltered area along a shoreline where the sea meets the land, providing safe anchorage and facilities for ships and boats to dock, load, and unload.
  • E. docking facility
    A docking facility is a designated structure or area where vehicles, vessels, or spacecraft securely attach for loading, unloading, maintenance, or passenger transfer.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d305088190ad13571532aa454c completed April 10, 2026, 12:10 p.m.
Created at: April 10, 2026, 1:35 p.m.