Triple

T19368069
Position Surface form Disambiguated ID Type / Status
Subject Telstar 3C E484455 entity
Predicate partOfSeries P1761 FINISHED
Object Telstar 3 series NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Telstar 3 series | Statement: [Telstar 3C, partOfSeries, Telstar 3 series]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Telstar 3 series
Context triple: [Telstar 3C, partOfSeries, Telstar 3 series]
  • A. Telstar 3D
    Telstar 3D was an American commercial communications satellite launched in the mid-1980s to provide television and telecommunications services.
  • B. Telstar 18
    Telstar 18 is the official Adidas match ball used for the 2018 FIFA World Cup in Russia, featuring a modernized design inspired by the original 1970 Telstar ball.
  • C. Telstar 3C communications satellite chosen
    Telstar 3C was a commercial communications satellite launched in 1984 to provide telecommunications services, including television and data transmission, primarily over North America.
  • D. T-Model
    The T-Model was an early leather football design used in top-level international competitions, including the inaugural FIFA World Cup.
  • E. Turbostar
    Turbostar is a family of modern British diesel multiple-unit trains widely used for regional and commuter services across the UK rail network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d305088190ad13571532aa454c completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e619adac8881909136c50351f3683d completed April 20, 2026, 12:18 p.m.
Created at: April 10, 2026, 1:35 p.m.