Triple
T1934467
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sony Semiconductor Solutions |
E41413
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | semiconductor manufacturer |
C136
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: semiconductor manufacturer Context triple: [Sony Semiconductor Solutions, instanceOf, semiconductor manufacturer]
-
A.
semiconductor manufacturing facility
A semiconductor manufacturing facility is a highly controlled industrial plant where raw silicon wafers are processed through complex, precise, and cleanroom-based fabrication steps to produce integrated circuits and microchips.
-
B.
Fabless semiconductor company
A fabless semiconductor company is a business that designs and sells integrated circuits and other semiconductor devices while outsourcing the actual manufacturing to specialized fabrication plants (foundries).
-
C.
manufacturing company
chosen
A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
-
D.
Intel subsidiary
An Intel subsidiary is a legally distinct company that is majority-owned and controlled by Intel Corporation to support its strategic, operational, or market objectives.
-
E.
Consumer electronics company
A consumer electronics company is a business that designs, manufactures, markets, and sells electronic devices and gadgets for everyday personal and household use.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88649b24c819080047f26b6db2ded |
completed | March 4, 2026, 7:21 p.m. |
Created at: March 4, 2026, 7:35 p.m.