Triple
T19323922
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Downtown New Brunswick |
E483296
|
entity |
| Predicate | traversedBy |
P225
|
FINISHED |
| Object | Route 18 |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Route 18 | Statement: [Downtown New Brunswick, traversedBy, Route 18]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Route 18 Context triple: [Downtown New Brunswick, traversedBy, Route 18]
-
A.
Route 18
chosen
Route 18 is a major state highway in central New Jersey that serves as a key north–south corridor connecting communities such as New Brunswick and Sayreville.
-
B.
Route 17
Route 17 is a state highway designation in Massachusetts used for a specific segment of roadway within the state's numbered route system.
-
C.
Route 17
Route 17 is a major state highway in New York that serves as a key transportation corridor through the southern part of the state, connecting numerous towns and villages.
-
D.
Route 21
Route 21 is a national highway in Costa Rica that serves as a key transportation corridor connecting communities in the northwestern part of the country.
-
E.
Route 21
Route 21 is a key state highway in New Jersey that runs along the Passaic River, serving as a major commuter and industrial corridor between Newark and Paterson.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d13e3c81909d91d1d5ec37c095 |
completed | April 10, 2026, 12:10 p.m. |
| NER | Named-entity recognition | batch_69e60d8a07508190a2e5f8972d1efba0 |
completed | April 20, 2026, 11:27 a.m. |
Created at: April 10, 2026, 1:32 p.m.