Triple

T19286911
Position Surface form Disambiguated ID Type / Status
Subject South Fork Feather River E482336 entity
Predicate hasHydroelectricPlant P15311 FINISHED
Object Sly Creek Powerhouse NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sly Creek Powerhouse | Statement: [South Fork Feather River, hasHydroelectricPlant, Sly Creek Powerhouse]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sly Creek Powerhouse
Context triple: [South Fork Feather River, hasHydroelectricPlant, Sly Creek Powerhouse]
  • A. Shanan Power House
    Shanan Power House is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
  • B. Holm Powerhouse
    Holm Powerhouse is a hydroelectric generating station within California’s Hetch Hetchy Power System that converts water from the Hetch Hetchy aqueduct into electricity.
  • C. South Fork Powerhouse
    South Fork Powerhouse is a hydroelectric generating station that harnesses the flow of the South Fork Feather River to produce electricity.
  • D. Barron Gorge Hydroelectric Power Station
    Barron Gorge Hydroelectric Power Station is a historic hydroelectric facility in Queensland, Australia, that harnesses the Barron River’s flow through Barron Gorge to generate renewable electricity.
  • E. Boney Falls Hydroelectric Plant
    Boney Falls Hydroelectric Plant is a hydroelectric power facility located on Michigan’s Escanaba River, generating electricity by harnessing the river’s flow.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Sly Creek Powerhouse
Target entity description: Sly Creek Powerhouse is a hydroelectric generating facility located on California’s South Fork Feather River, producing electricity from water stored in the nearby Sly Creek Reservoir.
  • A. Shanan Power House
    Shanan Power House is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
  • B. Holm Powerhouse
    Holm Powerhouse is a hydroelectric generating station within California’s Hetch Hetchy Power System that converts water from the Hetch Hetchy aqueduct into electricity.
  • C. South Fork Powerhouse chosen
    South Fork Powerhouse is a hydroelectric generating station that harnesses the flow of the South Fork Feather River to produce electricity.
  • D. Barron Gorge Hydroelectric Power Station
    Barron Gorge Hydroelectric Power Station is a historic hydroelectric facility in Queensland, Australia, that harnesses the Barron River’s flow through Barron Gorge to generate renewable electricity.
  • E. Boney Falls Hydroelectric Plant
    Boney Falls Hydroelectric Plant is a hydroelectric power facility located on Michigan’s Escanaba River, generating electricity by harnessing the river’s flow.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8cf61b0819096fe3e4107827c4e completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e5fc032f108190a89e47d1458f3f55 completed April 20, 2026, 10:12 a.m.
Created at: April 10, 2026, 1:30 p.m.