Triple

T1926096
Position Surface form Disambiguated ID Type / Status
Subject LEGO Mindstorms NXT E40834 entity
Predicate instanceOf P0 FINISHED
Object programmable robotics kit C6074 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: programmable robotics kit
Context triple: [LEGO Mindstorms NXT, instanceOf, programmable robotics kit]
  • A. robotics research platform chosen
    A robotics research platform is a configurable hardware and software system designed to develop, test, and evaluate robotic algorithms, sensors, and control strategies in controlled and repeatable environments.
  • B. robot
    A robot is an autonomous or semi-autonomous machine capable of sensing its environment, processing information, and performing physical or virtual tasks, often programmable to adapt to different functions.
  • C. robotics competition
    A robotics competition is an organized event where teams design, build, and program robots to complete specific tasks or challenges under defined rules and constraints.
  • D. robotics team
    A robotics team is a collaborative group of individuals who design, build, program, and test robots to solve specific challenges or compete in organized events.
  • E. autonomous robotic vehicle
    An autonomous robotic vehicle is a self-navigating mobile machine that perceives its environment, makes decisions, and moves without direct human control.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8864711648190b07bed24ed76258e completed March 4, 2026, 7:21 p.m.
Created at: March 4, 2026, 7:35 p.m.