Triple
T19259635
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CB Test Certificate |
E481611
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | conformity assessment document |
C2034
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: conformity assessment document Context triple: [CB Test Certificate, instanceOf, conformity assessment document]
-
A.
conformity assessment scheme
A conformity assessment scheme is a structured, predefined set of rules, procedures, and criteria used to systematically evaluate and determine whether products, services, systems, or persons meet specified standards or regulatory requirements.
-
B.
IEC Conformity Assessment System
The IEC Conformity Assessment System is a structured framework of international schemes and procedures used to evaluate and certify that electrical, electronic, and related technologies comply with IEC standards.
-
C.
standards-related document
chosen
A standards-related document is an authoritative publication that defines, explains, or supports the development, implementation, or interpretation of technical or organizational standards.
-
D.
IEC system for conformity testing and certification
An IEC system for conformity testing and certification is a standardized framework that defines procedures, criteria, and accreditation mechanisms to verify and certify that products, services, or systems comply with relevant IEC international standards.
-
E.
GAC document
A GAC document is an official record or report produced by a General Assembly Committee (GAC) that outlines its decisions, recommendations, proceedings, or policies.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8cd9d1081908a181d02b88b59b8 |
completed | April 10, 2026, 12:10 p.m. |
Created at: April 10, 2026, 1:28 p.m.