Triple

T19259294
Position Surface form Disambiguated ID Type / Status
Subject IEC 62680 E481601 entity
Predicate hasPart P35 FINISHED
Object IEC 62680-1 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: IEC 62680-1 | Statement: [IEC 62680, hasPart, IEC 62680-1]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: IEC 62680-1
Context triple: [IEC 62680, hasPart, IEC 62680-1]
  • A. IEC 62680 chosen
    IEC 62680 is an international standard that defines the Universal Serial Bus (USB) interface and related specifications for electronic devices.
  • B. IEC 62591
    IEC 62591 is an international standard that defines the WirelessHART industrial wireless communication protocol for process automation and control applications.
  • C. IEC 60086
    IEC 60086 is an international standard published by the International Electrotechnical Commission that defines the specifications, dimensions, performance, and designation system for primary batteries such as AAA cells.
  • D. IEC 61174
    IEC 61174 is an international standard that specifies performance, testing, and operational requirements for Electronic Chart Display and Information Systems (ECDIS) used in marine navigation.
  • E. IEC 61334
    IEC 61334 is an international standard that defines protocols and requirements for low-speed power line communication used in utility and smart grid applications.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8cd9d1081908a181d02b88b59b8 completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e5fb8858588190a04e2a01e43fb7b2 completed April 20, 2026, 10:10 a.m.
Created at: April 10, 2026, 1:28 p.m.