Triple

T19258812
Position Surface form Disambiguated ID Type / Status
Subject IEC 60870 E481591 entity
Predicate instanceOf P0 FINISHED
Object SCADA communication standard C2790 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: SCADA communication standard
Context triple: [IEC 60870, instanceOf, SCADA communication standard]
  • A. substation automation standard chosen
    A substation automation standard defines the protocols, architectures, and requirements that enable interoperable, secure, and automated monitoring, control, and protection of electrical substations.
  • B. fieldbus system
    A fieldbus system is an industrial network architecture that connects and coordinates field devices such as sensors and actuators with controllers for real-time data exchange and process automation.
  • C. EIA standard
    An EIA standard is a set of technical guidelines and specifications developed by the Electronic Industries Alliance to ensure compatibility, safety, and interoperability of electronic components and systems.
  • D. EV charging communication standard
    A standardized set of protocols and message formats that enable interoperable, secure communication between electric vehicles, charging stations, and backend systems for managing charging sessions and related services.
  • E. IEC system
    An IEC system is an Interactive Evolutionary Computation framework in which human users iteratively evaluate and select candidate solutions so that an evolutionary algorithm can optimize designs, media, or parameters based on subjective preferences.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8cd9d1081908a181d02b88b59b8 completed April 10, 2026, 12:10 p.m.
Created at: April 10, 2026, 1:28 p.m.