Triple
T19258666
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | IEC 60364 |
E481588
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | low-voltage electrical installation standard |
C8852
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: low-voltage electrical installation standard Context triple: [IEC 60364, instanceOf, low-voltage electrical installation standard]
-
A.
IEC standard
chosen
An IEC standard is a globally recognized technical specification developed by the International Electrotechnical Commission to ensure safety, interoperability, and performance of electrical and electronic systems and devices.
-
B.
IEC system
An IEC system is an Interactive Evolutionary Computation framework in which human users iteratively evaluate and select candidate solutions so that an evolutionary algorithm can optimize designs, media, or parameters based on subjective preferences.
-
C.
electrical enclosure
An electrical enclosure is a protective housing designed to contain electrical components and wiring, shielding them from environmental hazards and preventing accidental contact.
-
D.
DIN standard
A DIN standard is a formal technical specification developed by the German Institute for Standardization (DIN) that defines uniform criteria, dimensions, methods, or quality requirements for products, processes, and services.
-
E.
EIA standard
An EIA standard is a set of technical guidelines and specifications developed by the Electronic Industries Alliance to ensure compatibility, safety, and interoperability of electronic components and systems.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8cd9d1081908a181d02b88b59b8 |
completed | April 10, 2026, 12:10 p.m. |
Created at: April 10, 2026, 1:28 p.m.