Triple
T19246773
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Romney Sands |
E481279
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | holiday park area |
C15998
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: holiday park area Context triple: [Romney Sands, instanceOf, holiday park area]
-
A.
holiday park
chosen
A holiday park is a designated recreational area offering accommodation, leisure facilities, and organized activities for individuals, families, or groups on vacation.
-
B.
amusement park attraction area
An amusement park attraction area is a designated section within an amusement park that groups together themed rides, games, and entertainment experiences to create a cohesive and immersive visitor environment.
-
C.
amusement garden
An amusement garden is a landscaped outdoor space that combines traditional garden features with recreational attractions and playful installations designed for entertainment and leisure.
-
D.
adventure park
An adventure park is a recreational facility offering a variety of physically engaging and often adrenaline-inducing outdoor activities, such as zip lines, climbing courses, and obstacle challenges, designed for fun, fitness, and exploration.
-
E.
park complex
A park complex is a large, planned outdoor area that combines multiple recreational, natural, and community facilities—such as playgrounds, sports fields, gardens, and walking paths—into a unified public space.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8cd9d1081908a181d02b88b59b8 |
completed | April 10, 2026, 12:10 p.m. |
Created at: April 10, 2026, 1:27 p.m.