Triple

T192286
Position Surface form Disambiguated ID Type / Status
Subject Compact Linear Collider test facilities E3745 entity
Predicate abbreviation P43 FINISHED
Object CLIC test facilities E3745 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CLIC test facilities | Statement: [Compact Linear Collider test facilities, abbreviation, CLIC test facilities]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: CLIC test facilities
Context triple: [Compact Linear Collider test facilities, abbreviation, CLIC test facilities]
  • A. Compact Linear Collider test facilities chosen
    The Compact Linear Collider test facilities are experimental research installations at CERN dedicated to developing and validating technologies for a future high-energy electron–positron linear collider.
  • B. CERN Large Hadron Collider surface facilities
    The CERN Large Hadron Collider surface facilities are the above-ground buildings and infrastructure that support and control the LHC’s particle physics experiments near Geneva.
  • C. Linac4
    Linac4 is a linear accelerator at CERN that serves as the first stage of the proton acceleration chain for the Large Hadron Collider and other experiments.
  • D. CERN accelerator complex
    The CERN accelerator complex is a network of interconnected particle accelerators and beamlines near Geneva that produce and prepare high-energy particle beams for experiments such as those at the Large Hadron Collider.
  • E. Linac2
    Linac2 was CERN’s long-serving linear accelerator that pre-accelerated protons for injection into the Proton Synchrotron Booster and the rest of the accelerator complex before being superseded by Linac4.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2548debd48190ae3a06d6e65b53c6 completed Feb. 28, 2026, 2:35 a.m.
NER Named-entity recognition batch_69a259669ba08190a5be1d2e10e70b27 completed Feb. 28, 2026, 2:56 a.m.
NED1 Entity disambiguation (via context triple) batch_69a30cc6bfdc819091478e5102a3d64f completed Feb. 28, 2026, 3:41 p.m.
Created at: Feb. 28, 2026, 2:41 a.m.