Triple
T192243
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Compact Linear Collider test facilities |
E3745
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | accelerator test facility |
C63
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: accelerator test facility Context triple: [Compact Linear Collider test facilities, instanceOf, accelerator test facility]
-
A.
research facility
chosen
A research facility is a specialized institution equipped with laboratories, instruments, and resources where scientists and experts systematically investigate, experiment, and develop new knowledge or technologies.
-
B.
ARPANET node
An ARPANET node is a computer or host system connected to the ARPANET network that sends, receives, and routes data packets using early packet-switching protocols.
-
C.
rapid transit station
A rapid transit station is a designated facility where passengers board, alight, and transfer between high-frequency urban rail or metro services, typically featuring platforms, ticketing areas, and access to surrounding streets or other transport modes.
-
D.
aviator
An aviator is a person trained and licensed to operate and navigate aircraft through the air.
-
E.
electronic amplifying device
An electronic amplifying device is a component or system that increases the amplitude of an electrical signal without significantly altering its original characteristics.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a2548debd48190ae3a06d6e65b53c6 |
completed | Feb. 28, 2026, 2:35 a.m. |
Created at: Feb. 28, 2026, 2:41 a.m.