Triple

T19213811
Position Surface form Disambiguated ID Type / Status
Subject Presumpscot River E480424 entity
Predicate hasDam P8736 FINISHED
Object Gambo Dam NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Gambo Dam | Statement: [Presumpscot River, hasDam, Gambo Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Gambo Dam
Context triple: [Presumpscot River, hasDam, Gambo Dam]
  • A. Wyangala Dam
    Wyangala Dam is a major water storage and flood mitigation reservoir in New South Wales, Australia, serving irrigation, water supply, and recreational purposes.
  • B. Itumbiara Dam
    Itumbiara Dam is a large hydroelectric dam in Brazil known for generating significant electricity and forming one of the country’s major artificial reservoirs.
  • C. Bariri Dam
    Bariri Dam is a hydroelectric and river regulation structure located on Brazil’s Tietê River, contributing to regional power generation and water management.
  • D. Binga Dam
    Binga Dam is a major hydroelectric dam in the Philippines that harnesses the flow of the Agno River for power generation and water management.
  • E. Kiambere Dam
    Kiambere Dam is a major hydroelectric power facility in Kenya that harnesses the flow of the Tana River to generate electricity.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Gambo Dam
Target entity description: Gambo Dam is a hydroelectric and flood-control dam located on the Presumpscot River in Maine.
  • A. Wyangala Dam
    Wyangala Dam is a major water storage and flood mitigation reservoir in New South Wales, Australia, serving irrigation, water supply, and recreational purposes.
  • B. Itumbiara Dam
    Itumbiara Dam is a large hydroelectric dam in Brazil known for generating significant electricity and forming one of the country’s major artificial reservoirs.
  • C. Bariri Dam
    Bariri Dam is a hydroelectric and river regulation structure located on Brazil’s Tietê River, contributing to regional power generation and water management.
  • D. Binga Dam
    Binga Dam is a major hydroelectric dam in the Philippines that harnesses the flow of the Agno River for power generation and water management.
  • E. Kiambere Dam
    Kiambere Dam is a major hydroelectric power facility in Kenya that harnesses the flow of the Tana River to generate electricity.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8cb8c348190b52075823911c869 completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e5fa38c0e881908e9501ee21d0f266 completed April 20, 2026, 10:04 a.m.
Created at: April 10, 2026, 1:22 p.m.