Triple

T19196761
Position Surface form Disambiguated ID Type / Status
Subject Hasty, Colorado E469989 entity
Predicate hasNearbyFacility P5648 FINISHED
Object John Martin Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: John Martin Dam | Statement: [Hasty, Colorado, hasNearbyFacility, John Martin Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: John Martin Dam
Context triple: [Hasty, Colorado, hasNearbyFacility, John Martin Dam]
  • A. John Martin Dam chosen
    John Martin Dam is a large flood-control and water-storage structure on the Arkansas River in southeastern Colorado, forming the John Martin Reservoir.
  • B. Wilbur Dam
    Wilbur Dam is a hydroelectric dam on the Watauga River in northeastern Tennessee, known for creating Wilbur Lake and providing power and flood control.
  • C. Neely Henry Dam
    Neely Henry Dam is a hydroelectric dam on the Coosa River in Alabama, operated by Alabama Power for power generation, flood control, and recreation.
  • D. Jordan Dam
    Jordan Dam is a hydroelectric dam located on the Coosa River in central Alabama, used primarily for power generation and water management.
  • E. O'Shaughnessy Dam
    O'Shaughnessy Dam is a concrete arch-gravity dam in Yosemite National Park that creates the Hetch Hetchy Reservoir, supplying water and hydroelectric power to the San Francisco Bay Area.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd0ad9088190a173b32657ae2e7a completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5f8a695cc8190b84a220f52c51dfc completed April 20, 2026, 9:57 a.m.
Created at: April 10, 2026, 12:07 p.m.