Triple

T19192003
Position Surface form Disambiguated ID Type / Status
Subject Garib Rath Express E469862 entity
Predicate instanceOf P0 FINISHED
Object Indian Railways service C75 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Indian Railways service
Context triple: [Garib Rath Express, instanceOf, Indian Railways service]
  • A. former Indian railway system
    A former Indian railway system is a historically existing but now defunct or reorganized rail transport network that once operated within the geographical boundaries of India.
  • B. zone of Indian Railways
    A zone of Indian Railways is a major administrative and operational division that oversees railway infrastructure, train operations, and services within a defined geographic region of India’s rail network.
  • C. Indian Railways recruitment examination
    The Indian Railways recruitment examination is a competitive, nationwide test conducted by Indian Railways and the Railway Recruitment Boards to select eligible candidates for various technical, non-technical, and security-related posts across the railway network.
  • D. passenger rail service chosen
    Passenger rail service is a transportation system that operates trains to carry people between locations on a scheduled basis, typically offering various classes of comfort and amenities.
  • E. intercity coach service
    An intercity coach service is a scheduled, long-distance bus transportation system that carries passengers between cities or towns, typically offering reserved seating, luggage capacity, and limited intermediate stops.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd0ad9088190a173b32657ae2e7a completed April 10, 2026, 11:20 a.m.
Created at: April 10, 2026, 12:07 p.m.