Triple

T19180711
Position Surface form Disambiguated ID Type / Status
Subject Harbor Island E469563 entity
Predicate borderedBy P224 FINISHED
Object West Waterway NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: West Waterway | Statement: [Harbor Island, borderedBy, West Waterway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: West Waterway
Context triple: [Harbor Island, borderedBy, West Waterway]
  • A. East Waterway chosen
    East Waterway is a navigable industrial shipping channel in Seattle, Washington, separating Harbor Island from the mainland along the Duwamish River and Elliott Bay.
  • B. Sitcum Waterway
    Sitcum Waterway is an industrial maritime channel in Tacoma, Washington, forming part of the harbor infrastructure connected to Commencement Bay.
  • C. Burns Waterway
    Burns Waterway is a man-made channel in northwest Indiana that connects inland waterways to Lake Michigan near the city of Portage.
  • D. Dickinson Bayou
    Dickinson Bayou is a coastal waterway in southeastern Texas that flows through the city of Dickinson before emptying into Galveston Bay.
  • E. Indian Creek waterway
    Indian Creek waterway is a man-made canal in Miami Beach, Florida, that separates the barrier island from the mainland and serves as a scenic and navigable water route lined with residential and commercial properties.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd09d5a081909ae43c286651ae5a completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5f61be86c81908710341262e911cd completed April 20, 2026, 9:47 a.m.
Created at: April 10, 2026, 12:07 p.m.