Triple

T19158130
Position Surface form Disambiguated ID Type / Status
Subject Lisbon ILS E468979 entity
Predicate instanceOf P0 FINISHED
Object Instrument landing system C41206 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Instrument landing system
Context triple: [Lisbon ILS, instanceOf, Instrument landing system]
  • A. rotorcraft lander
    A rotorcraft lander is a vertical-takeoff-and-landing spacecraft or planetary probe that uses powered rotors instead of rockets or wings to descend, land, and maneuver near a surface.
  • B. piggyback seaplane system
    A piggyback seaplane system is an aircraft configuration in which a smaller, water-capable plane is mounted atop a larger carrier aircraft for transport, launch, or recovery operations over water.
  • C. short takeoff and vertical landing aircraft
    A short takeoff and vertical landing aircraft is a type of airplane designed to operate from very short runways and perform vertical or near-vertical takeoffs and landings using specialized lift and thrust systems.
  • D. Space Shuttle landing
    The Space Shuttle landing is the final phase of a shuttle mission in which the orbiter reenters Earth’s atmosphere and glides unpowered to a runway touchdown.
  • E. planetary lander technology demonstrator
    A planetary lander technology demonstrator is a prototype spacecraft designed to test and validate key landing systems, instruments, and operations for future missions to planetary surfaces.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd084ff48190ac0f8c46ee722629 completed April 10, 2026, 11:20 a.m.
Created at: April 10, 2026, 12:06 p.m.