Triple
T19102198
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sutlej River hydroelectric projects |
E467560
|
entity |
| Predicate | includesProject |
P14971
|
FINISHED |
| Object | Kol Dam Hydroelectric Project |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kol Dam Hydroelectric Project | Statement: [Sutlej River hydroelectric projects, includesProject, Kol Dam Hydroelectric Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Kol Dam Hydroelectric Project Context triple: [Sutlej River hydroelectric projects, includesProject, Kol Dam Hydroelectric Project]
-
A.
Kopili Hydroelectric Project
Kopili Hydroelectric Project is a major hydroelectric power station in Assam, India, built on the Kopili River to generate electricity for the northeastern region of the country.
-
B.
Bassi Hydroelectric Project
Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
-
C.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
D.
Nachtigal Hydropower Project
The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
-
E.
Karot Hydropower Project
The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Kol Dam Hydroelectric Project Target entity description: Kol Dam Hydroelectric Project is a major hydroelectric power station on the Sutlej River in Himachal Pradesh, India, developed to generate electricity and aid regional water management.
-
A.
Kopili Hydroelectric Project
Kopili Hydroelectric Project is a major hydroelectric power station in Assam, India, built on the Kopili River to generate electricity for the northeastern region of the country.
-
B.
Bassi Hydroelectric Project
Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
-
C.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
D.
Nachtigal Hydropower Project
The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
-
E.
Karot Hydropower Project
The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dd05ac4c8190b1967d8f97f3fb2f |
completed | April 10, 2026, 11:20 a.m. |
| NER | Named-entity recognition | batch_69e5e36e9bfc8190bbaccab169394d99 |
completed | April 20, 2026, 8:27 a.m. |
Created at: April 10, 2026, 12:04 p.m.