Triple

T19095900
Position Surface form Disambiguated ID Type / Status
Subject Tupahue station E467403 entity
Predicate instanceOf P0 FINISHED
Object aerial cable car station C12095 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: aerial cable car station
Context triple: [Tupahue station, instanceOf, aerial cable car station]
  • A. cable car station chosen
    A cable car station is a designated facility where passengers board, disembark, and transfer between cable-propelled vehicles, typically featuring platforms, ticketing areas, and equipment for operating and maintaining the cable system.
  • B. cable car system
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • C. mountain tramway
    A mountain tramway is an aerial or cable-driven transportation system that carries passengers or goods up and down steep mountainous terrain using suspended or rail-guided cars.
  • D. mountain railway terminus
    A mountain railway terminus is the end station of a rail line located in a mountainous area, where trains arrive, reverse, or terminate their journeys and passengers transfer to other transport or facilities.
  • E. mountain station
    A mountain station is a facility or settlement located at a high elevation in mountainous terrain, typically serving as a base for transportation, research, tourism, or outdoor activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd05ac4c8190b1967d8f97f3fb2f completed April 10, 2026, 11:20 a.m.
Created at: April 10, 2026, 12:04 p.m.