Triple

T19066544
Position Surface form Disambiguated ID Type / Status
Subject Long Island Rail Road branches E466672 entity
Predicate useElectrification P5320 FINISHED
Object 750 V DC third rail LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 750 V DC third rail | Statement: [Long Island Rail Road branches, useElectrification, 750 V DC third rail]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: useElectrification
Context triple: [Long Island Rail Road branches, useElectrification, 750 V DC third rail]
  • A. electrification
    Indicates the process or state of providing electrical power or converting something to operate using electricity.
  • B. electrificationUsedFor
    Indicates that electrification is employed as a means or method to achieve, enable, or support a particular function, process, or purpose.
  • C. electrificationUsedBy
    Indicates that a particular electrification system, method, or technology is employed or utilized by a given entity.
  • D. electrificationCompatibility
    Indicates whether one entity can be effectively and safely powered, charged, or operated using the electrical system, standards, or infrastructure associated with another entity.
  • E. electrificationSystem chosen
    Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd04f4488190b1121cc53ef2bfd6 completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5e198621481908618f65dd01746fc completed April 20, 2026, 8:19 a.m.
PD Predicate disambiguation batch_69e4b99f602881909eeb9c780597e0e6 completed April 19, 2026, 11:16 a.m.
Created at: April 10, 2026, 12:03 p.m.