Triple

T19045754
Position Surface form Disambiguated ID Type / Status
Subject Ferrari SF90 Stradale E466126 entity
Predicate instanceOf P0 FINISHED
Object mid-engine sports car C12034 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mid-engine sports car
Context triple: [Ferrari SF90 Stradale, instanceOf, mid-engine sports car]
  • A. mid-engine car chosen
    A mid-engine car is a vehicle whose engine is located between the front and rear axles, typically behind the passenger compartment, to optimize weight distribution and handling performance.
  • B. rear-engined car
    A rear-engined car is a vehicle whose engine is mounted behind the rear axle, typically improving traction but affecting handling dynamics compared to front- or mid-engined layouts.
  • C. front-engine automobile
    A front-engine automobile is a motor vehicle designed with its engine mounted at the front of the chassis, typically ahead of the passenger compartment, to drive either the front or rear wheels.
  • D. mid-size executive car
    A mid-size executive car is a premium, comfortably appointed sedan or estate offering higher levels of refinement, performance, and features than mainstream family cars, aimed at professional and business users.
  • E. high-performance sports car
    A high-performance sports car is a low, aerodynamically styled vehicle engineered with a powerful engine, advanced suspension, and precision handling to deliver exceptional speed, acceleration, and driving dynamics.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd0359648190bc2a9202c5cf29d2 completed April 10, 2026, 11:20 a.m.
Created at: April 10, 2026, 12:03 p.m.