Triple

T18975352
Position Surface form Disambiguated ID Type / Status
Subject Immeuble de la Rue Franklin E464280 entity
Predicate instanceOf P0 FINISHED
Object early modernist building C6817 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: early modernist building
Context triple: [Immeuble de la Rue Franklin, instanceOf, early modernist building]
  • A. modernisme building
    A modernisme building is an early 20th-century architectural structure characterized by organic forms, rich ornamentation, innovative use of materials, and a synthesis of arts and crafts, particularly associated with Catalan Modernism.
  • B. Streamline Moderne building
    A Streamline Moderne building is a late Art Deco architectural form characterized by smooth, curving surfaces, horizontal lines, nautical or aerodynamic motifs, and minimal ornamentation that evoke speed and modernity.
  • C. modernist city
    A modernist city is an urban environment characterized by functionalist architecture, rational planning, and an emphasis on efficiency, technology, and the separation of spaces for living, working, and recreation.
  • D. modernist architectural work chosen
    A modernist architectural work is a building or structure characterized by functional design, minimal ornamentation, and the expressive use of modern materials and technologies to embody the principles of simplicity, clarity, and rationality.
  • E. modernist architecture movement
    The modernist architecture movement is a 20th-century design approach that emphasizes functional forms, minimal ornamentation, and the honest expression of materials and structure in response to industrialization and new technologies.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd008af48190a97ff1c6488edf1b completed April 10, 2026, 11:20 a.m.
Created at: April 10, 2026, noon