Triple

T1897469
Position Surface form Disambiguated ID Type / Status
Subject One Bryant Park E37614 entity
Predicate instanceOf P0 FINISHED
Object green building C240 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: green building
Context triple: [One Bryant Park, instanceOf, green building]
  • A. green building certification system
    A green building certification system is a standardized framework that evaluates and rates buildings based on their environmental performance, resource efficiency, and sustainability practices throughout design, construction, and operation.
  • B. building chosen
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • C. greenway
    A greenway is a linear, often vegetated corridor of land or water designed primarily for recreation, conservation, and non-motorized transportation.
  • D. contemporary architecture
    Contemporary architecture is a style of building design characterized by innovative forms, advanced materials and technologies, sustainable practices, and an emphasis on functionality and integration with the surrounding environment.
  • E. green building certification level
    A green building certification level represents the degree to which a building meets defined sustainability and environmental performance standards set by a recognized rating system.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8861be7148190a680937ec451a304 completed March 4, 2026, 7:21 p.m.
Created at: March 4, 2026, 7:35 p.m.