Triple

T18968930
Position Surface form Disambiguated ID Type / Status
Subject S7 line E464113 entity
Predicate instanceOf P0 FINISHED
Object Berlin S-Bahn service C41473 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Berlin S-Bahn service
Context triple: [S7 line, instanceOf, Berlin S-Bahn service]
  • A. Berlin U-Bahn facility
    A Berlin U-Bahn facility is any physical structure, station, depot, or related infrastructure element that supports the operation, maintenance, or use of Berlin’s underground rapid transit system.
  • B. Berlin U-Bahn station
    A Berlin U-Bahn station is an underground or elevated public transit facility in Berlin that serves as a stop for the city’s metro trains, providing passenger access, ticketing, and connections to other transport modes.
  • C. Hamburg U-Bahn station
    A Hamburg U-Bahn station is a designated stop or terminal along Hamburg’s urban rapid transit network, providing platforms, access facilities, and passenger services for boarding and alighting U-Bahn trains.
  • D. Munich U-Bahn station
    A Munich U-Bahn station is an underground or surface-level transit facility in Munich’s rapid transit network where passengers access, board, and transfer between U-Bahn trains.
  • E. Nuremberg U-Bahn rolling stock
    Nuremberg U-Bahn rolling stock comprises the various types of electric multiple unit trains specifically designed and operated for passenger service on the Nuremberg, Germany, underground rail network.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcffc278819086792a4ebfddfafa completed April 10, 2026, 11:20 a.m.
Created at: April 10, 2026, noon