Triple
T18960489
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Drive |
E463898
|
entity |
| Predicate | hasTrack |
P3284
|
FINISHED |
| Object | Work in Progress |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Work in Progress | Statement: [Drive, hasTrack, Work in Progress]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Work in Progress Context triple: [Drive, hasTrack, Work in Progress]
-
A.
Work in Progress
chosen
Work in Progress was the provisional title under which James Joyce published early fragments of his experimental, linguistically dense novel Finnegans Wake.
-
B.
Under Construction
"Under Construction" is a critically acclaimed 2002 hip-hop album by Missy Elliott known for its innovative production, nostalgic nods to old-school rap, and hit singles like "Work It."
-
C.
Not Done Yet
"Not Done Yet" is an episode of the animated television series *Rocket Power*, which follows the extreme-sports adventures of a group of friends in the fictional town of Ocean Shores.
-
D.
Unfinished
Unfinished is the popular nickname for Franz Schubert’s Symphony No. 8 in B minor, renowned for its two completed movements and enduring mystery over why it was never finished.
-
E.
Working Drafts
Working Drafts are early-stage, publicly released specifications from the W3C CSS Working Group that outline proposed features and changes to Cascading Style Sheets for review and feedback.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dcffc278819086792a4ebfddfafa |
completed | April 10, 2026, 11:20 a.m. |
| NER | Named-entity recognition | batch_69e5d5d2b1c08190a4a32036c70c7746 |
completed | April 20, 2026, 7:29 a.m. |
Created at: April 10, 2026, noon