Triple

T18960489
Position Surface form Disambiguated ID Type / Status
Subject Drive E463898 entity
Predicate hasTrack P3284 FINISHED
Object Work in Progress NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Work in Progress | Statement: [Drive, hasTrack, Work in Progress]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Work in Progress
Context triple: [Drive, hasTrack, Work in Progress]
  • A. Work in Progress chosen
    Work in Progress was the provisional title under which James Joyce published early fragments of his experimental, linguistically dense novel Finnegans Wake.
  • B. Under Construction
    "Under Construction" is a critically acclaimed 2002 hip-hop album by Missy Elliott known for its innovative production, nostalgic nods to old-school rap, and hit singles like "Work It."
  • C. Not Done Yet
    "Not Done Yet" is an episode of the animated television series *Rocket Power*, which follows the extreme-sports adventures of a group of friends in the fictional town of Ocean Shores.
  • D. Unfinished
    Unfinished is the popular nickname for Franz Schubert’s Symphony No. 8 in B minor, renowned for its two completed movements and enduring mystery over why it was never finished.
  • E. Working Drafts
    Working Drafts are early-stage, publicly released specifications from the W3C CSS Working Group that outline proposed features and changes to Cascading Style Sheets for review and feedback.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcffc278819086792a4ebfddfafa completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5d5d2b1c08190a4a32036c70c7746 completed April 20, 2026, 7:29 a.m.
Created at: April 10, 2026, noon