Triple

T18946879
Position Surface form Disambiguated ID Type / Status
Subject Itogon E463535 entity
Predicate hasHydropowerFacility P15311 FINISHED
Object Ambuklao Dam vicinity NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ambuklao Dam vicinity | Statement: [Itogon, hasHydropowerFacility, Ambuklao Dam vicinity]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ambuklao Dam vicinity
Context triple: [Itogon, hasHydropowerFacility, Ambuklao Dam vicinity]
  • A. Ambuklao Dam chosen
    Ambuklao Dam is a major hydroelectric and flood-control dam in Benguet, Philippines, known as one of the country’s earliest large-scale hydropower projects.
  • B. Magat Dam
    Magat Dam is a large multipurpose rock-fill dam in the Philippines that provides hydroelectric power, irrigation, and flood control for the Cagayan Valley region.
  • C. Malpaso Dam
    Malpaso Dam is a major hydroelectric dam in Chiapas, Mexico, forming one of the country’s largest reservoirs and playing a key role in national power generation and flood control.
  • D. Saguling Dam
    Saguling Dam is a major hydroelectric and multipurpose dam in West Java, Indonesia, forming one of the key reservoirs on the Citarum River.
  • E. Mangahao Dam
    Mangahao Dam is a hydroelectric dam in New Zealand that forms part of one of the country’s earliest major power schemes.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcfec90481909e926be9767e5779 completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5d5402ad881908add559249278895 completed April 20, 2026, 7:26 a.m.
Created at: April 10, 2026, 11:59 a.m.